Daily Archive: 18.01.2024

Jan 18

Repair and restoration of 12 more irrigation canals

1

During the implementation of the project in 2023, 9 channels were completely repaired, which were selected in 2022 and 3 channels, which were selected in 2021. A total of 12 channels were repaired in 2023. All restored canals were handed over to the local population for use. Table of repaired selected channels in 2023 # …

Continue reading »

Permanent link to this article: http://jovid.tj/en/repair-and-restoration-of-12-more-irrigation-canals/

Jan 18

Training on the topic: “Managing the use of irrigation water”

1

As part of this event, 5 trainings were held, in which 89 target groups took part, including 19 women. Purpose of the training: to introduce participants to the basic methods of water resources management. The educational program was designed for 1 day. The first step was to determine the target groups’ expectations from the training. …

Continue reading »

Permanent link to this article: http://jovid.tj/en/training-on-the-topic-managing-the-use-of-irrigation-water/