Plans for continuing work on canal rehabilitation for 2024-2025

Additional selection of channels for repair and restoration

Project donors were pleased with the results of the work performed regarding the repair and restoration of canals from 2020 to 2023. Based on this, the donors agreed to extend the project for 24 months. In the next 24 months (2024-2025), another 11 channels will be restored in the Ishkashim region.

Selected channels that will be repaired:

#

Channel Construction works
1 Abdurahim Repair of the canal at a distance of 825 m (installation of plastic pipes – 650 m, construction of an artificial canal (trough) – 60 m, construction of protective stone walls – 106 m, construction of a bridge – 6 m, construction of the head structure of the canal – 3 m).
2 Vodgash Repair of the canal at a distance of 1032 m (installation of plastic pipes – 950 m, construction of an artificial canal (trough) – 10 m, installation of drainage pipes – 2 m).
3 Kasvur Repair of the canal at a distance of 120 m (construction of an artificial canal (trough) – 50 m, construction of protective stone walls – 28 m, construction of a drainage pipeline – 10 m, construction of the head structure of the canal – 3 m, concreting the bottom of the canal – 30 m).
4 Regzor Repair of the canal at a distance of 3962 m (cleaning the canal with an excavator – 3900 m, construction of protective stone walls – 20 m, construction of a bridge – 12 m, construction of a dam – 30 m).
5 Spedok Repair of the canal at a distance of 330 m (installation of plastic pipes – 230 m, construction of a one-way artificial canal – 11 m, construction of the canal head structure – 2 m).
6 Shkupn Repair of the canal at a distance of 111 m (construction of an artificial canal (trough) – 75 m, construction of the head structure of the canal – 6 m, construction of protective stone walls – 30 m).
7 Yajak Repair of the canal at a distance of 75 m (construction of an artificial canal (trough) – 38 m, construction of protective stone walls – 37 m).
8 Yanzgash Repair of the canal at a distance of 75 m (construction of an artificial canal (trough) – 66 m, construction of a support – 9 m).
9 Sarjui Vrang Repair of the canal at a distance of 275 m (construction of an artificial canal (trough) – 70 m, construction of a concrete wall – 15 m, construction of protective stone walls – 190 m).
10 Sarvod Repair of the canal at a distance of 210 m (installation of plastic pipes – 200 m, construction of an artificial canal (trough) – 6 m, construction of the canal head structure – 2 m, installation of a water intake pipeline – 2 m).
11 Khaskhorog Repair of the canal at a distance of 385 m (installation of plastic pipes – 170 m, construction of an artificial canal (canal) – 110 m, construction of the head structure of the canal – 2 m, construction of protective stone walls – 83 m, construction of a concrete one-sided wall – 20 m).

By the end of 2025, all planned construction work on the selected canals will be completed.