Plans for continuing work on canal rehabilitation for 2024-2025 Additional selection of channels for repair and restoration Project donors were pleased with the results of the work performed regarding the repair and restoration of canals from 2020 to 2023. Based on this, the donors agreed to extend the project for 24 months. In the next …
Monthly Archive: January 2024
Permanent link to this article: http://jovid.tj/en/additional-selection-of-channels-for-repair-and-restoration/
Jan 18
Repair and restoration of 12 more irrigation canals
During the implementation of the project in 2023, 9 channels were completely repaired, which were selected in 2022 and 3 channels, which were selected in 2021. A total of 12 channels were repaired in 2023. All restored canals were handed over to the local population for use. Table of repaired selected channels in 2023 # …
Permanent link to this article: http://jovid.tj/en/repair-and-restoration-of-12-more-irrigation-canals/
Jan 18
Training on the topic: “Managing the use of irrigation water”
As part of this event, 5 trainings were held, in which 89 target groups took part, including 19 women. Purpose of the training: to introduce participants to the basic methods of water resources management. The educational program was designed for 1 day. The first step was to determine the target groups’ expectations from the training. …
Permanent link to this article: http://jovid.tj/en/training-on-the-topic-managing-the-use-of-irrigation-water/